1. Describe the project and the result you want
Start with your city, the rooms or business areas you want updated, and the condition of the existing flooring. Photos of the main floor, doorways, stairs, and damaged areas are useful. Approximate room sizes help describe the scope, but final planning should use confirmed measurements.
Tell us whether you want to keep a similar finish or change the appearance completely. Include practical requirements such as pets, occupied bedrooms, opening hours, or a date tied to another renovation. RNALDI offers a free consultation to discuss your project.
2. Agree on the product and a clear scope
Review the proposed product, its approved uses, and how it will meet neighboring surfaces. Clarify removal, disposal, preparation, baseboards, transitions, and stairs before comparing estimates. If you are buying materials yourself, share the product details and accessories before confirming an installation plan.
Ask what can be assessed in advance and what may only be discovered when the existing covering is lifted. Agree how a change in scope would be communicated. Our flooring cost guide explains why these details matter more than a material-only square-foot price.
Bring your questions to a free consultation
Share your rooms, current floor, and the result you want. We’ll discuss the next steps for your LVP project.
Request your free consultation3. Prepare the space and access
- Confirm who is responsible for moving furniture and returning it afterward.
- Discuss fragile items, electronics, closets, and anything attached to the existing trim.
- Keep children and pets away from active work areas and planned access routes.
- Share parking, gate, elevator, delivery, or building-access requirements.
- For an occupied home, agree how you will reach essential rooms while work is underway.
- For a business, identify public areas, equipment, and times when access must remain available.
Appliance disconnection, plumbing, electrical work, and moving unusually heavy items should be discussed specifically rather than assumed to be included.
4. Assess and prepare the surface
After removal where needed, the installation surface is assessed against the selected floor’s requirements. Preparation can affect both the schedule and the work involved. If damage or moisture is uncovered, it should be addressed before it is hidden under new planks.
Storage, temperature, acclimation, underlayment, and moisture-control requirements vary by product. The correct plan follows the chosen manufacturer’s documents; there is no universal acclimation rule for every LVP collection. Shaw’s vinyl installation overview provides general background, with detailed instructions available by product.
5. Install, finish, and walk through the result
Layout decisions include plank direction, cuts along walls, doorways, and the relationship between connected spaces. Stair components, transitions, and perimeter finishing need to match the agreed scope and installation system.
Before the project is considered complete, discuss the finished areas, care instructions, and when furniture or rolling loads can return. That timing can depend on the product and any adhesive used. Keep the product name, documents, and labeled spare material together for future care or repair.
The schedule depends on the rooms, preparation, material readiness, and access. Tell us about your project so we can discuss an appropriate sequence instead of promising a universal one-day installation.